ʻO ka hilinaʻi kiʻekiʻe kiʻekiʻe a me ka helu ʻaiʻē maikaʻi e kū nei kā mākou mau loina, e kōkua iā mākou i kahi kūlana kiʻekiʻe. ʻO ka hoʻopaʻa ʻana i ka manaʻo o "ka maikaʻi mua, ka mea kūʻai kiʻekiʻe" no ke kūʻai wela no Kina Ss450 s460 s500 s550 s690 s890 s960 structural plate steel
Hoʻokipa maikaʻi mākou iā ʻoe e hoʻokumu i ka launa pū ʻana a hana i kahi wā e hiki mai ana me mākou.
Hot Sale no Kina Steel Pipe, Steel Tube, Loaʻa iā mākou i kēia manawa he hui kūʻai kūʻai hoʻolaʻa a ikaika, a me nā lālā he nui, e mālama ana i kā mākou mea kūʻai nui. Ke ʻimi nei mākou i nā hui ʻoihana lōʻihi, a e hōʻoia i kā mākou mea hoʻolako e pōmaikaʻi maoli lākou i ka wā pōkole a me ka lōʻihi.
Kūlana | AiSi, ASTM, bs, DIN, GB, JIS |
Papa | Ka mea kūʻai noi |
Kahi i kumu | Shandong, Kina |
Kapa inoa | Ka mea kūʻai noi |
Helu kumu hoʻohālike | Ka mea kūʻai noi |
ʻAno | Kaulike |
Palapala noi | Ka mea kūʻai noi |
Hoʻomanawanui | ±1% |
Hana Hana | Kuʻi, Kuʻi, Kuʻi, Hoʻoheheʻe, ʻoki |
Inoa mea kūʻai | Paʻa kihi kila |
ʻenehana | ʻOka Wela ʻAla Anu |
Lapaʻau ʻili | Koi o na mea kuai |
Pūʻolo | Kūʻai Kūʻai Kūʻai maʻamau |
Kinohi | Paʻa kihi ʻālikelike |
Palapala ʻia | ISO |
MOQ | 1 tona |
Uku | T/T 30%+70% |
Brand | Liange |
'ikamu | Nā mea hana hale |
inoa mea kūʻai |
pahu kihi kila |
Mea waiwai |
200Series/300Series/400Series |
ʻAno huahana |
201/202/301/302/303/303Se/304/304L/304N/XM21/305/309S/310S/316/316Ti S31635/316L/316N/316LN/317/317M/317/317M /403/405/410/420/430/431 |
Kūlana |
ASTM DIN GB ISO JIS BA ANSI |
Lapaʻau ʻili |
Hana ʻia, ʻEleʻele, Hoʻomaʻamaʻa, MirrorA/B, Lusterless, Holoi ʻakika, Pena Varnish |
ʻenehana |
huki anu, ʻōwili anu, ʻōwili wela. |
DIN |
Ka mea kūʻai noi |
Ka lōʻihi |
5.5m/5.8m/6m/9m/12m |
MOQ |
5 mau tona |
Hoʻopuka paʻi |
pahu kihi kila. |
ʻŌlelo o ka uku |
30% T / T a me 70% koena |
Ka manawa hoʻouna |
7-10 lā ma hope o ka loaʻa ʻana o ka waihona. |
Kūʻai kūʻai |
FOB, CIF, CFR, EXW. |
Awa
Awa Tianjin
<<<Picture Example
Lead Time:
Quantity(Tons) |
1 - 25 |
>25 |
Est. Time(days) |
10 |
To be negotiated |
1. Free sample can be supplied
2. Trial order is acceptable
3. Third party test is acceptable
4. Delivery time guarantee
--1. Q: What is your MOQ(minimum order quantity)?
A: Only One Piece
--2. Q: What is your packing methods?
A: Packed in bundle or bundle with plastic bag or bulk.
--3. Q: What is your payment terms?
A: T/T 30% in advance by T/T, 70% will be before shipment under FOB.
T/T 30% in advance by T/T, 70% against the copy of BL under CIF.
T/T 30% in advance by T/T, 70% LC at sight under CIF.
100% LC at sight CIF.
--4. Q: What is your delivery time?
A: Usually 15-20 days after received the advance payment, also depends on quantity.
--5. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
1. 2015 Kuwait airport construction
2.2017 Singapore tunnel project construction
3. Curtain wall project of Hong Kong Government in 2010
4.2020 London GRG project construction
5. Steel structure construction project of Liaocheng Cultural Square
6. Liaocheng gymnasium construction project
7. 5g signal tower in 2020
8. Steel structure construction in Singapore in 2020